Pillar 2A changes on the same day, partly so that risks now captured in Pillar 1 are not charged twice.
The SME and infrastructure support factors leave Pillar 1 and become firm-specific Pillar 2A adjustments, designed so that removing them does not, on its own, raise a firm’s capital requirements. The slotting risk weight for “substantially stronger” project finance falls to 50%.
In a one-off, off-cycle review the PRA will adjust Pillar 2 for any double counting and rebase variable Pillar 2A and the PRA buffer. Through the floor’s transition it will also rebase Pillar 2 so that floor-driven RWA increases do not raise Pillar 2A where the risk is unchanged.
From 1 January 2027, PS2/26 retires the refined methodology to Pillar 2A, and PS15/26 (Phase 1 of the PRA’s Pillar 2A review) removes the benchmarking methodology, IRB benchmarks included, and adds systematic methodologies for central government, central bank, regional government and local authority exposures and for retail unconditionally cancellable commitments. Phase 2 is due for consultation in 2027.
If your credit risk Pillar 2A relies on the refined methodology or IRB benchmarks, model its replacement now so the board sees the new figure in the capital plan.
Sources: PRA, PS9/24, 12 September 2024; PRA, PS7/25, 22 May 2025; PRA, PS2/26, 20 January 2026; PRA, PS15/26, 28 May 2026.